For the regional benchmark behind these numbers, see the 2026 Construction Price Index.
What decides your number
Two pool projects the same size can land thousands apart. Three things move the total more than anything else, and the first one does most of the work.
TradesMetrics prices every job at one of four finish levels. This single choice is what stretches the sell price from $70,000 to $117,000.
Ranges below are what each finish level typically sells for, at normal access.
Basic
$70-85kStandard
$72-88kPremium
$80-98kLuxury
$96-117k2 · Site access
An easy ground-floor pool with parking is cheaper to work in than a tight upper-floor space with stairs and no loading. Difficult access adds labor hours for moving materials and debris.
3 · Where in QC
Local trade wages and material costs set the baseline, and Quebec's larger metros run higher than its smaller cities. The same pool costs more in Montreal, Quebec City or Laval than in Gatineau, Longueuil, Sherbrooke or other cities in QC.
Where the money goes, and why markup is not margin
Here is a standard-finish, normal-access Quebec pool, milestone by milestone, then your cost, markup and price broken out by type. Ballpark for planning, not a line-item quote.
| Milestone | Lab | Mat | Equ | Sub | Fee | Total |
|---|---|---|---|---|---|---|
| Permits & Fees | - | - | - | - | $3,102 | $3,102 |
| Site Prep & Demolition | - | - | - | $1,034 | - | $1,034 |
| Excavation & Foundation | - | $376 | $2,867 | $4,324 | - | $7,567 |
| Exterior Works & Site | - | - | $6,580 | $48,645 | - | $55,225 |
| Closeout | $1,560 | - | - | $470 | - | $2,030 |
| Contingency | - | - | - | - | - | $0 |
| Your cost | $1,560 | $376 | $9,447 | $54,473 | $3,102 | $68,958 |
| Markup | $62440% | $3810% | $94510% | $5,44710% | $00% | $7,054~10.2% |
| Price | $2,184 | $414 | $10,392 | $59,920 | $3,102 | $76,012 |
Contingency is shown at $0 here. When you price a real job, account for it, typically 5 to 10% of cost.
Markup and margin are the same profit, not the same number. This job's 10.2% markup on your cost works out to only a 9.3% margin on the price. Markup is figured against your cost and margin against the higher sell price, so margin always lands lower. Price off the markup as if it were your margin and the job comes up short.
Full markup vs margin guide →Get your exact number, free
Pick your job, city, finish level and site access. The free estimating tool works it out line by line, no signup. When you're ready, that estimate carries straight through to your contract, budget, change orders and payments. One thread from first estimate to final payment.
Start your free estimate →Price it. Run it. Get paid.
Common questions
- How much does a pool build cost in Quebec in 2026?
- A standard pool build in Quebec costs a contractor about $68,958 to build, and at TradesMetrics default markups typically sells for about $76,012. See the ranges above for basic through luxury and easy through difficult access.
- What is the difference between basic, standard, premium and luxury?
- Basic is a full-scope pool build at entry finish: budget materials and standard fixtures, same layout. Standard steps up to mid-range materials and finishes with minor changes. Premium is semi-custom with high-end finishes and some layout change. Luxury is full custom: reworked layout and top-tier materials throughout.
- How much does a pool build cost per square foot?
- Most pool projects are priced by scope rather than by the square foot.
- Why does the price vary so much?
- For a Quebec pool, finish level is the biggest driver, then site access and where in the province you build. Trade wages vary by region, and larger metros run higher than smaller cities.
- Is this an estimate or a quote?
- It is an estimate: a planning range built from regional cost data and your finish level. A quote is a firm price a contractor gives after seeing the site and final selections. Use the estimate to set a budget, then get a quote to lock it in.
- How much should I budget for surprises?
- The base already reflects typical job costs, so you do not need a routine overrun buffer. Add an optional contingency (commonly 5 to 15 percent) only when a job carries real unknowns, like old wiring or plumbing you cannot see until the work opens up.
- What is the difference between markup and margin?
- On a standard pool priced with TradesMetrics default markups, the work costs you $68,958 and the client pays $76,012, the Price total of the table. That $7,054 difference is the same profit measured two ways: 10.2 percent of your cost (markup) but only 9.3 percent of the price (margin), because margin divides the same dollars by the larger price. The base already reflects typical job costs, so no contingency is added by default.
- What is the real cost of labor on a job?
- Base wage is not the real cost. Once you add payroll taxes, workers comp, benefits and paid time off, a worker costs 35 to 50 percent more than their hourly wage. Estimating off base wage is a common way to lose money.